in plain English.

Guides and definitions to help you make confident decisions about your project, whether it is your first renovation or your tenth.

Learn Before You Build

Better questions lead to better projects.

You do not need to become a builder to manage a successful project, but knowing a few key ideas helps you compare proposals, understand your schedule, and make decisions with confidence. Start with the guides below, then use the glossary whenever a new term comes up.

Guide

Design-build or design-bid-build?

There are two common ways to deliver a project. Both can work well. The right choice depends on your priorities.

Design-buildDesign-bid-build
ContractsOne contract for design and constructionSeparate contracts with the designer and the contractor
TimingDesign and pricing happen together, often saving timeDesign is finished before contractors bid
BudgetCost feedback throughout designFinal cost known after bids come in
AccountabilityOne team responsible for the resultResponsibility divided between designer and contractor
Best forOwners who want speed and a single point of contactOwners who want competitive bids on a finished design

How Oceanside offers both →

Guide

Planning a renovation budget: what to include.

Clear budgets start with knowing what is and is not included. Ask your contractor to walk you through each line.

  • Construction cost from a detailed written proposal
  • Allowances for finishes you have not selected yet
  • Design and engineering fees, if not included
  • Permit and inspection fees
  • A contingency for conditions found after walls are opened
  • Furniture, window treatments, and items outside the contract
Guide

Renovating a condominium: what to know first.

  • Read your association’s renovation rules before planning
  • Most associations must approve plans and the contractor
  • Work hours, quiet hours, and holiday restrictions apply
  • Elevator use and deliveries usually need reservations
  • Changes to plumbing, structure, or windows may need extra approvals
  • Insurance certificates are usually required before work starts
Glossary

Terms you will hear.

Fourteen common construction terms, explained simply.

Allowance

An amount included in the price for items not yet selected, such as tile or fixtures. If your selection costs more or less, the price adjusts.

Certificate of Completion or Occupancy

Issued by the building department after final inspections, confirming the work meets code.

Change order

A written agreement to change the scope, price, or schedule after the contract is signed.

Design-build

One contract covers both design and construction, so the designer and builder work as one team with one point of accountability.

General contractor

The licensed company responsible for building the project, coordinating subcontractors, and managing schedule, quality, and safety.

Lien release

A signed statement that a contractor, subcontractor, or supplier has been paid and waives lien rights for that amount.

Long-lead item

A product that takes weeks or months to arrive, such as custom windows, cabinetry, or imported stone. These often drive the schedule.

Notice of Commencement

A document the owner records with the county before work starts on improvements over $2,500. It identifies the owner, contractor, and property for lien purposes.

Notice to Owner

A notice a subcontractor or supplier sends to preserve its right to file a lien if it is not paid.

Punch list

A list of small items to finish or correct before the project is considered complete.

Request for information

A written question from the contractor to the designer when the drawings are unclear or conditions differ from what was expected.

Shop drawings

Detailed drawings prepared by a fabricator, such as a millwork shop, showing exactly how an item will be built.

Submittals

Product data, samples, and shop drawings sent to the design team for approval before materials are ordered.

Value engineering

Reviewing materials and methods to reduce cost while keeping the design intent and quality.

Have a question we did not cover?

Ask us. An owner will be glad to explain anything about your project.